Phase 2 – 2011
The Main Drain Phase 2 involves the dredging of approximately 1000 metres of the Main Drain Channel, works are due to start April 2011.
The Main Drain Phase 2 involves the dredging of approximately 1000 metres of the Main Drain Channel, works are due to start April 2011.